Size: $27 million
Duration: 2020 - 2022
Kyah Resources cleared 62 km of the Coastal GasLink Pipeline right-of-way through the challenging terrain of the rigged Coast Mountain Range. Kyah used various clearing methods to complete the work such as standard and steep slope harvesting equipment, helicopter logging, and hand falling, all without a single lost time incident.